Rustoleum
3366 Powerfloat Epoxy Floor Primer 5L

BN4948005F
FREE next working day delivery available
£165.95 inc. VAT
Trade customer? - log in to get your prices. close

Tell us where you are to check stock for Click & Collect:

Fast curing two pack epoxy adhesion primer for power float concrete floors . Overcoatable after 3 hrs (at 20 degrees centigrade).
3366 Powerfloat Epoxy Floor Primer
Share...

In detail

A rapid curing two pack epoxy adhesion primer, for use on dense, smooth floors like power-floated concrete, quarry tiles and ceramic tiles. 

The primer is overcoatable after just 3 hours (at 20 degrees centigrade) but within 36 hours.

Size
5L 
Coverage
Up to 10sq/m per litre 
VOC level
Low 
Thinning
Do not thin 
Touch dry
1-4 hours 
Recoatable
1-4 hours 
Cleanup
Water & Detergent 

Additional information

Epoxy Powerfloat Floor Primer Rapid 3366 is a rapid curing 2-component water-based epoxy primer for dense, smooth floors like power-floated concrete. It has excellent adhesion and binding power. Can be used with all Rust-Oleum® or Mathys epoxy and polyurethane coatings. Recoating time of only 3 hours allows application of primer and topcoat in one day. Primer has a light grey finish, creating a better opacity for the following coating.

Surface Preparation
Concrete must be at least four weeks old, completely dry and free of surface laitance, contaminants, and previous poorly bonded coatings. Remove grease, oil and all other surface contaminations by alkaline or high pressure (steam) cleaning. Remove all previous coatings completely. For optimum results blast cleaning of the surface is recommended.

Mixing
Pour the liquid from the two smaller tins into the larger outer tin. Stir the mixture thoroughly until an even colour and consistency are obtained. Do not mix more material than can be applied in 2 hours.

Application
Apply with a medium pile type roller. Replace rollers and roller pan after 2 hours. Do not apply at temperatures below 10°C or above 30 °C.

Recoating Time
3 hours (at 15 °C and 50% rel. humidity) Cold or damp conditions may retard or prevent full curing.

Theoretical Coverage
10 m²/L at 50 pm dry (depends on surface)

Cleaning of Material
Immediately after use with warm soapy water.

Storage
Store the product between 10 and 25 °C for at least 12 hours prior to use.