Traffic HD Silk Matt Clear 4.95L

Product Code: FE107515F

Traffic HD Silk Matt Clear 4.95L

Product Code: FE107515F

Waterborne, high performance finish for heavy traffic areas

£188.00 Inc VAT £156.67 Exc VAT
Quantity
Check store stock
Collection branch.
Delivery
Delivery Van.
Estimated delivery:
Free next day delivery
£188.00 Inc VAT £156.67 Exc VAT
A waterborne, high performance, hardwood floor finish for heavy traffic areas. 
Has excellent durability, and can be used on both residential and commercial floors.
Size
4.95L
Barcode
7312799215538
Coverage
Up to 10sq/m per litre
VOC level
Low
Thinning
Water
Touch dry
1-4 hours
Recoatable
Over 24 hours
Scrubbability
Washable
Colour
Clear
Finish
Satin
Cleanup
Water & Detergent

Data Sheets

Additional Information

Surface Preparation

Prior to application the surface must be pre-treated with a waterborne primer from Bona. Ensure floor is acclimatized to its end-use environment, well sanded, dry and free from sanding dust, oil, wax and other contamination. Allow varnish and hardener to reach room temperature.

Application

  • Shake the Traffic HD can and add one bottle of Traffic HD Hardener.
  • Immediately shake the mixture thoroughly for 1 minute and then insert the enclosed filter.
  • If mixing smaller quantities of varnish then pour the required amount of varnish into a separate can.
  • 1 litre of varnish corresponds to one part of hardener. 2 litres to two parts a.s.o.
  • The mixture of varnish/hardener should be used directly or at least within 4 hours.
  • Apply the varnish using a roller.
  • Roll with a smooth, flowing motion alternately across and with the grain of the wood avoiding accumulations of product.
  • Always maintain a 'wet edge' to avoid overlaps.
  • Allow to dry properly before applying further layers.
  • Anticipate slightly longer drying time for each layer that is applied.

Floor will take light foot traffic approximately 8 hours after the final application and may be put into full use after 12 hours. Allow the surface to dry for at least 3 days before covering with carpets or other flooring. Avoid placing heavy objects and avoid damp mopping the floor during this time. Note: If Traffic HD has been combined with Bona Primer Deep and Bona Create then the surface must be allowed to sure for 1 week before covering the surface.

Related Products